Jumat, 10 Januari 2014

Pelatihan POD, WP&B, dan AFE

Oleh: Sinang Bulawan

October, 21st - 24th 2008, Padma Hotel BALI

Plan of Development (POD) is the key point in the Oil and Gas business of Indonesia Upstream Oil and Gas project. POD is a guideline for “The Contractor “ (KKKS) in running the oil and gas project. Beside as a planning program, POD also including description planning of activities, budgeting program and financial authorization. In the Indonesia PSC Term, WP & B, AFE and POD is the integrated aspect that every “Contractor” have to proposed its to BP Migas and then BP Migas will approve its. Therefore, between BP Migas and The Contractor should be have the same perception all about aspect of POD, AFE and WP&B especially about the basic principle, mechanism and procedure, system and operational guideline.



Sinang Bulawan dan Peserta Pelatihan

WHO SHOULD ATTEND?
- Finance, Accounting, Budgeting, Cost Control, Financial Analyst
- POD, AFE and WP&B Team
- Project Engineering and Economic
- Commercial Planning
- Reservoir Engineers, Petroleum Engineers, Exploration Engineers
- Development Engineers, Exploitation Engineers’ Drilling and production engineers
- Operations engineers and Facilities engineers
- Any persons who involved the POD, AFE and WP&B aspect
- Anybody who wish to knowing about the above aspect


Sinang Bulawan dan Peserta pelatihan


TRAINING OUTLINE
·Oil and Gas Business Process
·Upstream Oil and Gas Activity [Exploration Licensing, Exploration, Drilling Development, Production and Transportation, Marketing and Selling]
·Introduction to Oil and Gas Field Development Program
·Regulations of Indonesia Upstream Oil and Gas and Other Policy related to field development program
·The PSC Terms and Conditions
·Basic Principle of POD, AFE and WP&B
·General Procedure and Mechanism of POD, AFE and WP&B
·PSC Financial Budget and Reporting
·Budgeting Preparation Program
-Petroleum Accounting Principle : Successful Efforts, Full Costing and Reserve Recognition Accounting
-Type of Cost : Capital Vs Non Capital
Exploration Budget
Drilling & Development Budget
Production & Facilities Budget
General Administration and Support Activities Budget
Financial Summary
- Budget Scheduling Program
- Financial Expenditure
Basic principle
Preparation
AFE Seismic and G&G
AFE Development and Drilling Wells
AFE Production Facilities and Support
AFE Process, Reporting and Close Out
· Oil and Gas Resources and Reserves
· Project Economics, Evaluation and Risk Analysis


Sinang Bulawan dan Peserta pelatihan



TRAINING METHOD
- Lecturing and class room session
- Case Study
- Interactive Sharing Information and Experience
- Group Discussion, Question and Answer Session



Sinang Bulawan dan Peserta pelatihan


The Facilitators
SINANG BULAWAN*. Received Bachelor Degree in Mining Engineering from University of Sriwijaya and Petroleum Enggineering from University of Tulsa, USA. He has more experience in petroleum industry with various responsibility in planning engineering, production, operation and drilling etc. Currently he as Vice President of Operation BPMIGAS. Prof. DR. Ir. Widjajono Partowidagdo, MSc, MSOR. He is a professor of petroleum economic and an instructor that has high qualification both in academic and practical expertise in petroleum economics in oil and gas industries and he has conducted many project consultations of major oil and gas industry in Indonesia. He is a senior lecturer in Petroleum Engineering, Bandung Institute of Technology and Magister Management Programs, ITB. He received BS degree in Petroleum Engineering from Petroleum Department, ITB, Master degree (M.Sc.) in Petroleum Engineering and Operations Research, Master degree (MA) in Economics and Doctor (Ph.D) in engineering both from University of Southern California, USA. He also gets many short course programs in Energy Planning & Policy from University of Wincousin, USA; Energy Economic Study from AIT, Bangkok-Thailand; and Resources Accounting Course from World Resources Institute, Washington DC, USA RINTO PUDYANTORO, SE, MM. He received BS degree in Finance Accounting from Gajahmada University and master degree in International Finance. Currently he attends to Doctor degree in Resources and Environment Economics. He has more that 15 years working experience in oil and gas industry. Currently he joint to BP Migas and Accounting and Revenue Division of BP Migas.